Hello, over the spring/summer, I work full time for a private bicycle assembly and repair company, which is in turn contracted by Walmart to work on thier bikes. So from Monday to Friday, I am building 25 boxed bikes per day. Also, there are numerous repairs, since Walmart bikes aren't exactly the best! It's funny how some of the repairs coming in range from simple flat tires (it's not worth the wait to bring in a flat tire for repair) to completely destroyed frames!
Anyways, I was wondering if anyone else here does the same type of work i do? I'm looking for tips on how to build the bikes fast. Right now, I can build about 4 adult bikes per hour. At $5 CDN per bike, it works out pretty well. Right now though, I am being nagged by a sore back. It gets tiring lifting those bikes out of the boxes all the time.
Anyways, I was wondering if anyone else here does the same type of work i do? I'm looking for tips on how to build the bikes fast. Right now, I can build about 4 adult bikes per hour. At $5 CDN per bike, it works out pretty well. Right now though, I am being nagged by a sore back. It gets tiring lifting those bikes out of the boxes all the time.