TAMBA received a $250,000 donation from Kyle and Jess Aster for the Meeks Ridge trail. This stretch is about five miles long with roughly 1,400 feet of elevation change, and once it is done, it connects Meeks Bay and Lost Lake to complete a 12-mile Tahoe loop. The project is about 75 percent complete, and TAMBA expects completion by fall 2027. It is also open to class 1 e-bikes.
There is a purity to the grind of climbing and the suffering of a long loop, but the way these things get funded now is different. When a quarter of a million dollars drops from a private source to finish a specific link, it changes the dynamic of how we build. Most of us just want a place to put in the hard miles and face the elements without the politics.
Does a $250,000 private donation to finish one Tahoe trail set a good precedent for publicly accessible trail networks, or does it make trail priorities too dependent on donor preferences?
Beyond the money, does allowing class 1 e-bikes on a climb with 1,400 feet of elevation change fundamentally alter the grit required for that specific section of the loop?