Anyone fancy owning their own Trig Point?
General fitness, health and nutrition · Public discussion
Anyone want a Trig Point?
Thread navigation
Jump through the discussion
Go to the original post, the replies on this page, or the latest preserved contribution.
Thread details
What we know about this thread
- Original section
- General fitness, health and nutrition
- Published
- 26 January 2006
- Last activity
- 8 February 2006
- Original author
- WheresThePath.com
- Posts
- 49
- Discussion status
- Public discussion
- Total views
- 976
- Views / 30 days
- 0
- Topics
The navigation and discussion metadata provide context. Posts remain in their original chronological order.
-
-
"WheresThePath.com" <[email hidden]> wrote in message
news:[email hidden]...Quoted message said:
Anyone fancy owning their own Trig Point?
I don't see that fitting in my car boot, but it would look great in the
garden. I wonder how much that will cost to ship and lift into position
Steve--
The UK SpeedTrap Guide" @ www.ukspeedtraps.co.uk
The UK Weather Guide" @ www.ukstorms.com -
[email hidden] said...
Quoted message said:
"WheresThePath.com" <[email hidden]> wrote in message
news:[email hidden]...Quoted message said:
Anyone fancy owning their own Trig Point?
eBay item number 7384553432Quoted message said:
Quoted message said:
I don't see that fitting in my car boot, but it would look great in the
garden. I wonder how much that will cost to ship and lift into position
Steve
I could get it in the car, but I'd have to strap the children on the
roof or tow them on rollerskates behind me on the way back. I wonder
how much it actually weighs? Pity it's not a particular trig that means
something special to me, or I'd probably go for it - mad impetuous fool
that I am :-)--
To reply see 'from' in headers; lose the domain, and insert dots and @
where common sense dictates. -
"Steve - www.ukspeedtraps.co.uk" <[email hidden]> wrote in message
news:[email hidden]...Quoted message said:
"WheresThePath.com" <[email hidden]> wrote in message
news:[email hidden]...Quoted message said:
Anyone fancy owning their own Trig Point?
I don't see that fitting in my car boot, but it would look great in the
garden. I wonder how much that will cost to ship and lift into position
SteveSame here - awesome.
I'm thinking of making one in my front garden.
The website says 24"x24" base and 48" above ground, what are the dimensions
at the top i.e by how much does it taper ?Or does anyone have the specific dimensions ?
Thanks
-
In message <[email hidden]>, Fran
<[email hidden]> writesQuoted message said:
I could get it in the car, but I'd have to strap the children on the
roof or tow them on rollerskates behind me on the way back. I wonder
how much it actually weighs? Pity it's not a particular trig that means
something special to me, or I'd probably go for it - mad impetuous fool
that I am :-)At 1.5m high (including a bit extra at the bottom) x 0.6 x 0.6 =0.54m3
volume of stoneI'd say the best part of a tonne, possibly a shade more.
Regards.
--
Neil Pugh -
The message <[email hidden]>
from Neil Pugh <[email hidden]> contains these words:Quoted message said:
At 1.5m high (including a bit extra at the bottom) x 0.6 x 0.6 =0.54m3
volume of stoneQuoted message said:
I'd say the best part of a tonne, possibly a shade more.
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.--
Roger Chapman so far this year nothing -
Quoted message said:
From the remains of one - see pic below - it appears that the void is a
approx 3" iron tube through the centre of the trig, don't know if
there's a larger chamber lower down.http://www.wheresthepath.com/county_tops/ct_bridgend.htm
James
-
In message <[email hidden]>, Roger
<[email hidden]> writesQuoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.Regards
--
Neil Pugh -
In message <[email hidden]>, Roger
<[email hidden]> writesQuoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.Regards
--
Neil Pugh -
Neil Pugh said:
Quoted message said:
I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.Regards
Well from that your best estimate of the whole construction is 42cwt -
the stuff used to make it. Thats a bit over 2 tonnes for the metric
kiddies.Andy
-
Neil Pugh said:
Quoted message said:
I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.Regards
Well from that your best estimate of the whole construction is 42cwt -
the stuff used to make it. Thats a bit over 2 tonnes for the metric
kiddies.Andy
-
The message <[email hidden]>
from Neil Pugh <[email hidden]> contains these words:Quoted message said:
Quoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.Quoted message said:
I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.Quoted message said:
<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>I couldn't get that link to work but did eventually get to Nick Cranes
article. I also saw that particular mapman program although I can't
recall very much about it.Quoted message said:
"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I have a photo somewhere of that trig point (adorned by an attractive
young lady) and I am sure it is a standard trig point. Why they should
have required enough materials to make one and a half cubic yards of
concrete beats me.On another visit to that summit I found it occupied by two young men
working their way through a 7 pint can of beer resting on said trig
point.Quoted message said:
I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).Quoted message said:
I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.I think you will find that there is a direct connection from the brass
plug in the top to the ground below where there might be the brass
button that was the earlier trig point.--
Roger Chapman so far this year nothing -
The message <[email hidden]>
from Neil Pugh <[email hidden]> contains these words:Quoted message said:
Quoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.Quoted message said:
I realise that this does not give the weight of the actual pillar, but
the following url makes interesting reading.Quoted message said:
<http://www.telegraph.co.uk/travel/main.jhtml?xml=/travel/2004/10/30/ettr
igpillars.xml&sSheet=/travel/2004/10/30/ixtrvhome.html>I couldn't get that link to work but did eventually get to Nick Cranes
article. I also saw that particular mapman program although I can't
recall very much about it.Quoted message said:
"The pillar on top of Cadair Idris in Wales took 12 days to construct,
and required a team of packhorses rented from a Dolgelly coal merchant
to carry the 42 cwt of chippings, sand and cement to the 3,000ft summit
of the mountain. In his report, the builder complained of "terrible"
mists and heavy rain."I have a photo somewhere of that trig point (adorned by an attractive
young lady) and I am sure it is a standard trig point. Why they should
have required enough materials to make one and a half cubic yards of
concrete beats me.On another visit to that summit I found it occupied by two young men
working their way through a 7 pint can of beer resting on said trig
point.Quoted message said:
I can't find the actual dimensions of the pillar anywhere. The approx
dims though are 2 feet square at base and 4 feet high above ground.
There is also some underground of course. At (say) an average size of
450mm square x 1500mm high that's about 0.3m3 concrete, about 0.66
tonnes. (If it isn't hollow of course).Quoted message said:
I've seen some broken pillars in the past and I don't recall them being
hollow. There is a small recess at the base for the plate though.I think you will find that there is a direct connection from the brass
plug in the top to the ground below where there might be the brass
button that was the earlier trig point.--
Roger Chapman so far this year nothing -
"Roger" <[email hidden]> wrote
Quoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.
I've been looking but can't find anything yet, although I know I've got a
diagram somewhere which I'll put a link to when i find it. The pillars were
built over the actual point, which was a bolt in the rock, so there could be
quite a bit structure *underground* if there was a lot of soil/peat between
the surface and the rock.Graham
-
"Roger" <[email hidden]> wrote
Quoted message said:
I don't have a trig point to hand to measure but I reckon the dimensions
are overall and generous with it so your estimate of volume may be out
by a factor of two or more. And average density is an issue too. Trig
pillars are hollow although I don't know exactly how big the interior
void is. Perhaps Graham will be along in a bit to direct us to the
dimensions for the British Standard trig point.
I've been looking but can't find anything yet, although I know I've got a
diagram somewhere which I'll put a link to when i find it. The pillars were
built over the actual point, which was a bolt in the rock, so there could be
quite a bit structure *underground* if there was a lot of soil/peat between
the surface and the rock.Graham
-
In message <[email hidden]>, Roger
<[email hidden]> writesQuoted message said:
I have a photo somewhere of that trig point (adorned by an attractive
young lady) and I am sure it is a standard trig point. Why they should
have required enough materials to make one and a half cubic yards of
concrete beats me.
There's probably a large block of concrete supporting it, assuming it
hasn't been built on bedrock!Regards
--
Neil Pugh -
In message <[email hidden]>, Roger
<[email hidden]> writesQuoted message said:
I have a photo somewhere of that trig point (adorned by an attractive
young lady) and I am sure it is a standard trig point. Why they should
have required enough materials to make one and a half cubic yards of
concrete beats me.
There's probably a large block of concrete supporting it, assuming it
hasn't been built on bedrock!Regards
--
Neil Pugh -
The OS have blocked the sale.
Richard Webb
-
[email hidden] said...
Quoted message said:
The OS have blocked the sale.
What? Why? The spoilsports!--
To reply see 'from' in headers; lose the domain, and insert dots and @
where common sense dictates. -
Fran said:
[email hidden] said...
Quoted message said:
Quoted message said:
The OS have blocked the sale.
What? Why? The spoilsports!They will be claiming copyright on the pillar :-)
Well, at least that they own the pillar. The fact is that that they
have no use for it anymore, so why not let the farmer sell it to get
rid of it?
--
Phil Cook looking north over the park to the "Westminster Gasworks"
Active in the last 60 minutes
Active in this thread
0 users · 0 guests ·0 bots ·0 total
No signed-in users are active right now.
No known search crawlers active right now.