"Temporary" Halt to Cycling on Brisbane Airport

Started by Donga · · Last activity · 9 posts · 1,716 views

This thread is locked and is currently read-only.

Thread navigation

Jump through the discussion

Go to the original post, the replies on this page, or the latest preserved contribution.

Thread details

What we know about this thread

Original section
Australia and New Zealand
Published
24 April 2008
Last activity
28 April 2008
Original author
Donga
Posts
9
Discussion status
Public discussion
Total views
1,716
Views / 30 days
0

The navigation and discussion metadata provide context. Posts remain in their original chronological order.

Showing posts 1–9 of 9
Posts remain in their original chronological order.

Text size
  1. Temporary Halt to Cycling on Brisbane Airport from Monday 26 May 2008

    Good afternoon,

    As you are aware Brisbane Airport is currently undergoing major
    redevelopment as part of our
    $2.5 billion infrastructure program.

    The extent and scale of the construction activity, which is
    highlighted on the attached map, is
    now affecting most primary and secondary roads across the Airport.

    Impacts on airport roads we are currently experiencing as a result of
    construction activity are:
    • Significant increase in the number of large loaded and unloaded
    trucks travelling on
    Airport roads
    • Reductions in lane widths
    • Loss of / reduction in shoulder widths on roads
    • Lane closures and diversions
    • Frequent changes to traffic management measures
    • Potential for site material to be present on Airport roads

    In addition, we now have approximately 75,000 cars per day travelling
    to and from Brisbane
    Airport. Airport Drive in fact now carries around the same volume of
    vehicles as the Gateway
    Motorway, and is, in effect, a major motorway in itself.

    As a result of this work and the associated changed conditions on
    Airport roads, and in the
    interests of safety, Brisbane Airport Corporation has decided to
    temporarily halt the use of
    bicycles on Airport roads, effective from Monday 26 May 2008.

    The closure of Airport roads to cyclists will remain in place for
    around 18 - 24 months, at which
    time BAC will assess construction activity and its affect on roads, as
    well as the ability of the
    road network to support safe cycling.

    BAC Position on Cycling

    Notwithstanding the closure of Airport roads to cyclists during
    construction work, BAC
    supports and actively promotes sustainable transport options to and
    from the airport, and, in
    principle, the use of bicycles by travellers and employees as an
    environmentally sustainable
    and healthy transport option.

    The Brisbane Airport Master Plan has consistently reflected the
    intention of BAC to develop
    bicycle paths that connect terminals, business precincts and other
    areas of the airport.
    The 2008 Master Plan will build on this commitment, with the further
    development of plans to
    create an Airport-wide cycle strategy, including paths, crossings and
    cycle parking facilities.
    The BAC strategy will be developed in consultation with Brisbane City
    Council and the
    Queensland State Government to ensure that cycle paths on Brisbane
    Airport are delivered at
    a time when safe connections to the public entrances to the Airport,
    via dedicated bicycle
    pathways operated by the Brisbane City Council and the Queensland
    Statement Government,
    are in place, creating a region-wide cycling network.

    Queries

    If you would like us to provide a briefing for you and your staff or
    if you have any queries about
    this matter please contact our Information Line on 1800 737 075 and
    the team will be able to
    assist.

    Yours sincerely,
    Mark Willey
    Executive Manager Airport Planning
    Brisbane Airport Corporation

  2. Donga said:

    Temporary Halt to Cycling on Brisbane Airport from Monday 26 May 2008

    Good afternoon,

    As you are aware Brisbane Airport is currently undergoing major
    redevelopment as part of our
    $2.5 billion infrastructure program.

    The extent and scale of the construction activity, which is
    highlighted on the attached map, is
    now affecting most primary and secondary roads across the Airport.

    Impacts on airport roads we are currently experiencing as a result of
    construction activity are:
    • Significant increase in the number of large loaded and unloaded
    trucks travelling on
    Airport roads
    • Reductions in lane widths
    • Loss of / reduction in shoulder widths on roads
    • Lane closures and diversions
    • Frequent changes to traffic management measures
    • Potential for site material to be present on Airport roads

    In addition, we now have approximately 75,000 cars per day travelling
    to and from Brisbane
    Airport. Airport Drive in fact now carries around the same volume of
    vehicles as the Gateway
    Motorway, and is, in effect, a major motorway in itself.

    As a result of this work and the associated changed conditions on
    Airport roads, and in the
    interests of safety, Brisbane Airport Corporation has decided to
    temporarily halt the use of
    bicycles on Airport roads, effective from Monday 26 May 2008.

    The closure of Airport roads to cyclists will remain in place for
    around 18 - 24 months, at which
    time BAC will assess construction activity and its affect on roads, as
    well as the ability of the
    road network to support safe cycling.

    BAC Position on Cycling

    Notwithstanding the closure of Airport roads to cyclists during
    construction work, BAC
    supports and actively promotes sustainable transport options to and
    from the airport, and, in
    principle, the use of bicycles by travellers and employees as an
    environmentally sustainable
    and healthy transport option.

    The Brisbane Airport Master Plan has consistently reflected the
    intention of BAC to develop
    bicycle paths that connect terminals, business precincts and other
    areas of the airport.
    The 2008 Master Plan will build on this commitment, with the further
    development of plans to
    create an Airport-wide cycle strategy, including paths, crossings and
    cycle parking facilities.
    The BAC strategy will be developed in consultation with Brisbane City
    Council and the
    Queensland State Government to ensure that cycle paths on Brisbane
    Airport are delivered at
    a time when safe connections to the public entrances to the Airport,
    via dedicated bicycle
    pathways operated by the Brisbane City Council and the Queensland
    Statement Government,
    are in place, creating a region-wide cycling network.

    Queries

    If you would like us to provide a briefing for you and your staff or
    if you have any queries about
    this matter please contact our Information Line on 1800 737 075 and
    the team will be able to
    assist.

    Yours sincerely,
    Mark Willey
    Executive Manager Airport Planning
    Brisbane Airport Corporation

    The matter has been reported on in our 'esteemed' rag, The Courier
    Mail

    http://www.news.com.au/couriermail/story/0,23739,23592202-952,00.html

    Feel free to add your comment, but be warned, you are in company of
    the usual Brisbane bigots, who know no depths.

    Donga

  3. They - sorry, I - don't call it the bogan state for no reason.

  4. Watch out for my letter to the editor as well as my comment on the site.

    [censored].

  5. On Apr 27, 7:41 pm, LotteBum <LotteBum.38i...@no-

    mx.forums.cyclingforums.com said:

    Watch out for my letter to the editor as well as my comment on the site.

    [censored].

    --
    LotteBum

    Just for the record, LotteBum is not one of the bigots to whom I
    referred - she's a different one.

    Donga
    😉

  6. Isn't it incredible that someone removes transport provisions before providing a satisfactory alternative solution. A similar occurence happened for removing access for cyclists to the westbound shoulder of the M2 in Sydney.

    They wouldn't close the airport access to motorised traffic for a year and a half to two years without putting place an alternative route for one week or even one day

    What does someone do if cycle touring to or from the airport. Do they camp at the Airport, or the other end of the Airport Drive for 2 years while they wait for a solution to be put in place. I'm not familiar with the railway facilities available there. How difficult is it to take bikes on the train?

    Regular commuters should get access to a free on demand shuttle service.

    OR

    Free travel pass on the rail service shuttle,

    OR

    the implementation of a cycleway as an alternative.

    for narrowed lanes lack of shoulders equate to necessary lowered speed limits, and have them enforced. and especially for trucks.

    Lower the speed limit on the airport drive to a thoroughly enforced 40km/h speed limit. It is a construction work zone isn't it, so enforced 40km/h work zone speed limits should apply.

    Michael G

  7. What, and slow down the airport's profits.

    Lives and livelihoods aren't that important

    SCotty

    mikeg said:

    Isn't it incredible that someone removes transport provisions before providing a satisfactory alternative solution. A similar occurence happened for removing access for cyclists to the westbound shoulder of the M2 in Sydney.

    They wouldn't close the airport access to motorised traffic for a year and a half to two years without putting place an alternative route for one week or even one day

    What does someone do if cycle touring to or from the airport. Do they camp at the Airport, or the other end of the Airport Drive for 2 years while they wait for a solution to be put in place. I'm not familiar with the railway facilities available there. How difficult is it to take bikes on the train?

    Regular commuters should get access to a free on demand shuttle service.

    OR

    Free travel pass on the rail service shuttle,

    OR

    the implementation of a cycleway as an alternative.

    for narrowed lanes lack of shoulders equate to necessary lowered speed limits, and have them enforced. and especially for trucks.

    Lower the speed limit on the airport drive to a thoroughly enforced 40km/h speed limit. It is a construction work zone isn't it, so enforced 40km/h work zone speed limits should apply.

    Michael G

  8. On Apr 28, 4:20 pm, scotty72 <scotty72.38k...@no-

    mx.forums.cyclingforums.com said:

    What, and slow down the airport's profits.

    Lives and livelihoods aren't that important

    SCotty

    mikeg said:

    Isn't it incredible that someone removes transport provisions before
    providing a satisfactory alternative solution. A similar occurence
    happened for removing access for cyclists to the westbound shoulder of
    the M2 in Sydney.

    Quoted message said:

    They wouldn't close the airport access to motorised traffic for a
    year and a half to two years without putting place an alternative route
    for *one week or even one day*

    Quoted message said:

    What does someone do if cycle touring to or from the airport. Do they
    camp at the Airport, or the other end of the Airport Drive for 2 years
    while they wait for a solution to be put in place. I'm not familiar
    with the railway facilities available there. How difficult is it to take
    bikes on the train?

    Quoted message said:

    Regular commuters should get access to a free on demand shuttle
    service.

    Quoted message said:

    OR

    Quoted message said:

    Free travel pass on the rail service shuttle,

    Quoted message said:

    OR

    Quoted message said:

    the implementation of a cycleway as an alternative.

    Quoted message said:

    for narrowed lanes lack of shoulders equate to necessary lowered
    speed limits, and have them enforced. and especially for trucks.

    Quoted message said:

    Lower the speed limit on the airport drive to a thoroughly enforced
    40km/h speed limit. It is a construction work zone isn't it, so
    enforced 40km/h work zone speed limits should apply.

    Quoted message said:

    Michael G

    --
    scotty72

    That's about the strength of it. They are building massive carparks
    and charging extortionate monopoly parking fees. Parking must be a
    major profit centre for the airport.

    As to the speed limit, they have put up concrete barriers in the side
    lane and the road is still 2-3 lanes wide, so no reall need to slow up
    - except if there are cyclists - or slow/stopped cars, but they are
    ok, they are part of the legitimate traffic.

    donga

  9. Donga said:

    On Apr 28, 4:20 pm, scotty72 <scotty72.38k...@no-

    mx.forums.cyclingforums.com said:

    What, and slow down the airport's profits.

    Lives and livelihoods aren't that important

    SCotty

    mikeg Wrote:


    snip

    Quoted message said:

    --
    scotty72

    That's about the strength of it. They are building massive carparks
    and charging extortionate monopoly parking fees. Parking must be a
    major profit centre for the airport.

    Yes, high parking charges is a big money earner for Sydney Airport, Domestic and International.

    Donga said:

    As to the speed limit, they have put up concrete barriers in the side
    lane and the road is still 2-3 lanes wide, so no reall need to slow up
    - except if there are cyclists - or slow/stopped cars, but they are
    ok, they are part of the legitimate traffic.

    donga


    And cyclists are also part of the legitimate traffic too! So those that are affected and Bicycle Queensland should be requesting consideration to providing an alternative route, before closing the existing route.

    Michael G

Active in the last 60 minutes

Active in this thread

0 users · 0 guests ·0 bots ·0 total

No signed-in users are active right now.

No known search crawlers active right now.