Donga said:
The Brisbane CBD BUG put in a submission on the Hale Street Link,
available on our website
http://cbdbug.googlepages.com/ .
We oppose the bridge on several grounds, but recognising that we may
not get our way, make a range of positive suggestions about such
matters as connections to the north (presently woeful), cycling on the
Link and approach roads, improved cycling amenity in South Brisbane and
cycling access during construction. We have asked to be included in the
primary consultation team throughout design and construction.
Donga
Keep up the good work, Donga. I've read the CBDBUG submission and I
like several of the points regarding cycle amenity. Traffic planners
consistently miss the mark. "Bikepath" in Brisbane often = footpath
with stick figures painted on or an isolated green strip petering out
when it all gets a bit hard.
The CBDBUG submission also points out that "the bridge will contribute
to, rather than solve, traffic problems" - very true. Bridge proponents
have chanted the "need the HSL to reduce congestion" mantra, but don't
(and can't) back it up with figures. The draft Impact Assessment
Statement was prepared for council by GHD. It puts a _very_ positive
spin on the figures, but scratch the surface and you'll find the
forecast effects of the HSL:
- increased traffic on Coro Drive (3500 vehicles per day), Hale St (7000
to 9000 vpd!) and others - Vulture, Merivale, Cordelia.
- hugely increased congestion on Hale St - from level of service C to
LOS F (The HSL puts Hale St into gridlock!)
The only bit of road that benefits from the HSL is (unsurprisingly) the
William Jolly Bridge and its immediate approaches. All of the approach
roads to the area suffer increased traffic and/or worse congestion.
(And that's in 2011 - after that it just gets worse!)
What will be the result of this? Why, in ten years time, there'll be
calls for more roads to combat the terrible congestion on Hale St, Coro,
Vulture St, Gladstone Rd, etc, etc, etc. It's a vicious cycle.
Sorry for the rant. The original point is, if you don't want this
bridge (and only the bridge construction companies should,) read the
original post. Contact your local councillor by email and by phone on
Monday morning.
The Labor councillors in general are showing spinelessness and are
reluctant to make a decision they think might be unpopular. We need to
set them straight.
Thanks for your tolerance.
Dave
PS If you live in Acacia Ridge ward, your councillor is Cr. Bianchi.
I think he's Labor.