Quoted message said:Ian Smith posted ...
Quoted message said:Quoted message said:Quoted message said:Danny Colyer posted ...
> More notice would have been nice.
A weeks notice isn't enough, sheesh, what would be ?
Try shutting a through-route for cars (say, the M25)
with 2.5 days notice and see how you get on.What do you think they can do except shut a cycle path if
it's being resurfaced ? It's not as if the cyclists can't
use the road, is it, so it's only like blocking a
specific lane of a road off .. which is often done, even
on motorways, with absolutely zero notice.
Not for routine maintenance.
As for 'it's not as if the cyclists can't use the road", it
may have escaped your notice, but in teh case of doing works
on teh M25, it's not as if motorists can't use other roads.
Quoted message said:One day the whole motorway is open, the next there's only
two or one lane open .. with no notice given or expected
Again, not for routine maintenance. Furthermore, when works
might upset motorists then all sorts is done with
contraflows etc. to minimise disruption. In some cases they
go as far as to construct temporary new roads alongside teh
work site to take teh traffic. Nothing like this much
thought is ever applied to cycle facilities - it's just 'use
the road', regardless of how inconvenient that may be.
There used to be one decent off-road path near me - up teh
A24 between Dorking and Leatherhead. It's teh only
segregated facility I use locally. Someone's decided to
upgrade a water main, and for teh best part of a year teh
cycle path has been ripped to shreds and dotted with big
holes (as in 4m square, 3 or 4m deep). Construction plane is
parked over the path, in places they've ripped teh surface
up and left a sea of mud, and elsewhere there are great
stacks of steel water main pipes. So the poor hard-done-by
motorist doesn't get his two lanmes reduced to one, teh
cyclist loses the entire facility. Great.
regards, Ian SMith
--
|\ /| no .sig
|o o|
|/ \|