Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
A community for cyclists, gear, training and racing.
UK and Europe · Public discussion
Thread navigation
Go to the original post, the replies on this page, or the latest preserved contribution.
Thread details
The navigation and discussion metadata provide context. Posts remain in their original chronological order.
Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
wafflycat said:Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
Surely the best! Just bunny hop on to the railsI guess and slide on in...
Graham
--
aghillo.blogspot.com <http://aghillo.blogspot.com/>
wafflycat said:Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
If it was anything else today I would assume it was photoshopped.
As it's a cycle lane I believe this one is genuine.
peter
wafflycat said:Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
Even if the fence were not there, there is still a bin in the way, the
kerb has not been dropped, and there are not any apparent signs
indicating the the path is shared.
Martin.
On Wed, 02 Apr 2008 16:28:54 GMT, Martin Dann <[email hidden]>
Quoted message said:wafflycat said:Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
Even if the fence were not there, there is still a bin in the way, the
kerb has not been dropped, and there are not any apparent signs
indicating the the path is shared.
The two kerbstones where the cycle path turns into appear to be new.
The blanket crossing a few metres further along the road also looks
new. I therefore suspect that the outer and inner railings and the
bin are new features, and there has been some work to the pavement,
although that is not so obvious.
Tom Crispin said:On Wed, 02 Apr 2008 16:28:54 GMT, Martin Dann <[email hidden]>
Quoted message said:wafflycat said:Truly an inspired choice for April 01...
http://www.warringtoncyclecampaign.co.uk/facility-of-the-month/
Even if the fence were not there, there is still a bin in the way, the
kerb has not been dropped, and there are not any apparent signs
indicating the the path is shared.The two kerbstones where the cycle path turns into appear to be new. The
blanket crossing a few metres further along the road also looks new. I
therefore suspect that the outer and inner railings and the bin are new
features, and there has been some work to the pavement, although that is
not so obvious.
It's obvious, the cycle path is just directing cyclists to the wheel
bender cycle rack.
--
Cheers,
Mark Pearson
Active in the last 60 minutes
0 users · 0 guests ·0 bots ·0 total
No signed-in users are active right now.
No known search crawlers active right now.