From the beeb:
"""
City's newest bridge is named
A £500,000 bridge has been named in a ceremony.
Highgate Bridge is a footbridge and cycleway which crosses the A690 near
Castle Chare in Durham City and will link the railway station with the
city centre.
The name was chosen after a public competition, which attracted more than
100 entries.
The 100ft steel bridge will be part of a cycle route to the north of the
city which will be completed later this year.
"""
From me:
During its construction it was known as the Castle Chare Cycle Bridge. The
name plaques, which I noticed on Monday, don't mention cycles. I note that
it "will be" part of a cycle route. It certainly doesn't link the railway
station with the city centre for cyclists as it involves rather a lot of
steps.
Access, by bike, to the bridge is limited. On the railway station side the
only route cycles can take is through a new housing development, over some
cobbles which have already become a de facto parking area for the
residents. On the other side of the bridge it emerges onto a part cobbled
back road. One direction feeds straight back onto the A690, the road the
bridge bridges. In the other direction a tarmac slope has been added
alongside the steps. This is a very steep slope with a wooden barrier at
the bottom. I can see it being useful for walking a bike down but not for
cycling up or down.
Finally the newly designed roundabout (well it was a roundabout, it's now
a roundabout with a road going through the middle of it and lots of
lights) near the bridge now has two light controlled crossings marked for
cycles as well as pedestrians. None of the pavements are dual use, yet.
The thirdr crossing is pedestrians only.
The layout raises lots of questions which I suspect should be addressed to
someone in the council. However, my last letter to the council, regarding
cycle parking that had been removed during re-paving, was replied to
politely but the promised action was never taken. There is still no
replacement cycle parking.
Colin