On 16 Mar 2006 05:56:06 -0800, "dkahn400" <[email hidden]>
Quoted message said:Ian Blake said:On 15 Mar 2006 08:53:21 -0800, "dkahn400" <[email hidden]>
wrote:
Quoted message said:Quoted message said:There's a path on either side. At the Welsh end there's a glass-strewn
tunnel to get from one side to the other.
The south/downstream side is intended for walkers and maintenance
only. Fortunately walkers do not puncture.
Actually I am wrong, walkers do. If they do not use Clark's Marathons
or some other foot tyre the inner tubes will ooze red slime when
walking on broken glass.
Quoted message said:
Well, I've certainly ridden across both sides. Perhaps I did something
wrong?
You didn't jump off so that's OK.
I am only basing my assertion from the observation that heading East
from Chepstow we arrive at a sign that instructs walkers down the
slope to the tunnel and cyclists to keep right straight onto the left
side of the Wye bridge.
At the time the second crossing was being planned the local cycling
groups campaigned for a foot/cycle crossing but the company argued
there were no cycles or foot paths near the bridge so the bridge did
not need them. Campaigners pointed out paths to the bridge would be
built. The bridge builders said it would be too expensive and they
would never regain the cost of construction. The Department of
Transport accepted this. The bridge operators have since completely
recovered their building costs and the income from the bridges
continues to dwarf the maintenance expense.
I suppose the calls for a cycle path were hampered by the green lobby
sending mixed messages. The cyclists liked the idea of the South West
being five miles closer. However some blinkered campaigners were
focused on no new roads ever.