--
Frank
[email hidden]
Drop DACKS to reply
"alison_b" <[email hidden]> wrote in message
news:[email hidden]...
Quoted message said:
Poiter said:Has anyone any information about roads authorities laying rubber
conveyor matting over longitudinally planked bridges?
Somewhere I have read that it has been done temporarily for Big Rides
and such.
Has it been done permanently anywhere?
There's an issue with the Naas River bridge on the Fitz's Challenge
route (ACT) that I am trying to sort out before the 20/11.
Thanks
Pete Heal
I'm not sure if this is useful, but I know that at the Pt Macquarie 1/2
Ironman recently a rubber matting of some sort was rolled out over a
speed bump (some dodgy brickwork with quite aggressive ridges in it).
Perhaps something like this would be ok for the ride? It was rolled up
and taken away after though; certainly not a permanent thing.
cheers,
Ali
Interesting. If mats and the like are used for events then taken up after
does that mean that there is a recognised hazard? If so, if someone takes a
spill on, say, a commuting ride, does that mean they would have a claim that
they were exposed to a known hazard? Tricky one in the sue-happy society in
which we live...
Far better to build speed bumps, bridges, etc to be cycle friendly in the
first place. Remember that we all share the cost of these claims in one way
or another.
Cheers,
Frank (need a new bike. Where's a plank bridge around here...?)